D5.1: BO&C implementation plan for the three Demonstration BuildingsThis document describes the plans, including time schedule, for the installation of the PEBBLE system inside the three demonstration buildings. This includes the communication system, the sensors and actuators in the respective zones of the buildings, as described in deliverable D3.1. It can be used as a reference for performing the actual installation in each building.
Dissemination Level: Restricted
|