Sign In | Sign Up

Actions

Related pages

Demo Buildings

TUC
In addition to thermal-comfort problems for the building users, based on energy audits and simulation results the energy consumption of the specific building is quite high at 130 kWh/m2a. The TUC building is unspectacular in most ways and in that sense typical of many existing office buildings in Greece and elsewhere. It has a ...

MORE
    FIBP
    The building is equipped with a surface heating and cooling system with thermally activated building constructions. Each office room is equipped with a separately regulated heating/cooling circuit in the ceiling and in the floor slabs. In addition to these, a number of other control elements, sensors, energy-efficiency and user...

    MORE
    RWTH
    The building apart from being a lot bigger than the other two demonstration buildings is also challenging thermally due to its multifunctionality, having both office and conference spaces as well large laboratories which need to be appropriately climatized. In this case, a good energy performance has to be assured by a modern b...

    MORE
    © 2010-12 PEBBLE Consortium Partners. All rights reserved. Web-site developed by Katsigarakis Kyriakos  W3C Valid W3C Valid
    Summary Impact Technical Approach Work Packages Project Info
    News Events
    TUC FIBP RWTH
    Scientific Papers Conference Publications Dissemination Materials Deliverables Others
    TUC FIBP RWTH TUGRAZ CSEM ARMINES SBC